Proje 3 tr | Cwt v13 Firma Yazılımı
Background

Proje 3 tr

Proje 3 tr

  • Proje Sahibi: Metehan ALYAR
  • Proje Konumu: Çerkezköy
  • Proje Zamanı: Ocak 1970
  • Kategori: İnşaat

In order to meet the required schedule, TransGas delegated procurement and construction management services to WSP. WSP’s procurement procedures allowed for the selection of contractors and material suppliers in an efficient manner while still ensuring traceability for insurance auditors. The tight schedule for the emergency repairs required a collaborative effort between the Saskatchewan Industrial group (Project Management, Mechanical Engineering and Structural Engineering) and the Calgary Oil & Gas group (Electrical Engineering the Calgary Oil & Gas group (Electrical Engineering the Calgary Oil & Gas group (Electrical Engineering and Procurement Services).

Aklınıza takılan her konu için
Bize 7/24 Ulaşabilirsiniz
Bize Ulaşın

Numaranızı Bırakın Sizi Biz Arıyalım

X
Whatsapp Destek.
Bize Whatsapp tan yazabilirsiniz